construction

4,142 photos and 12 illustrations tagged construction, from 58 members of Flickr Commons.

When were these photos & illustrations taken?

417
1850
2026

 

Where were these photos & illustrations tagged?

31% of these photos & illustrations are geotagged.

Tags that often appear on the same photos & illustrations:

Members using this tag

Photos & Illustrations

Show photos & illustrations photos (4,142) illustrations (12)

A selection of photos & illustrations tagged construction:

Loading photos & illustrations…

See more on flickr.com →

Recent uploads

The last upload was 6 October.

Conversations

Here’s a selection of the conversations happening on these photos & illustrations:

26_0061398 Rohr Collection Image

  • Chuck Walla said:
    A manifold to remove soil hydrocarbons?

26_0070547 Rohr Collection Image

  • Chuck Walla said:
    According to the South Bay Historical Society, this may be part of a widening of Interstate 5 through Chula Vista.

    The white car is a Desoto. The power lines give this away as Chula Vista area. I'm tagging these as Interstate 5 construction. Please post a comment below if this is incorrect.

Ria Grande Mine Shaft, Mount Isa, 1929

  • Barry Merrick said:
    Ore Bins under construction. Lawlor Shaft, Rio Grande Orebody. 27th September 1930. This orebody was developed to bring the surface to be dumped into the bins. From these bins a train would take this ore around to a Glory Hole in the Black Star mine and dump the ore down to 4 Level Haulage. Around this time disaster struck the 4 Level Drive due to cutting into a huge aquifer and the water inflow was uncontrollable. The miners were sent elsewhere while the water inrush was being controlled. The miners started out to cut a downhill drive from 4 Level in the Rio Grande to a meet up with the 4 Level Haulage drive from Black Star Mine to No. 1 Ore Shaft, Urquhart Shaft. This made the surface operation at Lawlor Shaft redundant
  • Vesna Verencevic said:
    MOUNT ISA MINES LIMITED. The following progress report has been receded from the Mine Superintendent of Mount Isa Mines Limited for the period ended November 15 :— Lawler Shaft.—Rio Grande lode, 150ft. level: North drive was extended 14ft. 6in, total 103ft, from the main crosscut. Average assay values were 28.5 percent, lead, and 28.7oz. sliver per ton, over a width of 53in., with ore on both sides of the drive South drive was extended 16ft. to a total of 82ft., from the main crosscut, in ore averaging 25.6 percent, lead, and 23oz. silver per ton, over a width of 47in., with ore on both sides of the drive. Diamond drill borehole No. 1 was sunk 57ft., to a total depth of 197ft. below the surface, and cased to 90ft. In hard shale and ironstone. Source: "The Brisbane Currier" 30 Nov 1926 trove.nla.gov.au/newspaper/article/21087400#